摘要 基于超深水半潜式钻井平台的典型特征,提出双井口作业系统总体规划方法,重点针对大钩载荷、立根盒载荷、井架及起升系统型式、隔水管存放方式、防喷器组存储方式和处理系统型式等几个关键点开展分析,确定系统主要载荷和技术参数,规划钻台、月池、堆场等区域布置,形成一套适用于目标平台的双井口作业系统总体设计方案。形成的方案可作为超深水半潜式钻井平台开发的设计基础。 According to the typical characteristics of ultra deepwater semi-submersible drilling platform,the overall planning method of the dual well operation system is given.The analysis of hook load,pipe setback load and types of derrick and hoisting system,riser storage,blow out preventer(BOP)stack storage and processing system is mainly focused on.The main loads and technical parameters of the system are confirmed.An arrangement plan of the drill floor,moon pool and pipe rack area is proposed.A general design of the operation system is formed,which provides the design basis for ultra deepwater semi-submersible drilling platform.
作者 田雪 赵建亭 刘海霞 TIAN Xue;ZHAO Jianting;LIU Haixia(Marine Design and Research Institute of China,Shanghai 200011,China)
出处 《中国海洋平台》 2021年第4期77-81,共5页 China offshore Platform
关键词 半潜式钻井平台 超深水 双井口作业系统 总体设计 semi-submersible drilling platform ultra deepwater dual well operation system general design
  • 相关文献

参考文献9

二级参考文献46

  • 1李家春.水面下的波浪——海洋内波[J].力学与实践,2005,27(2):1-6. 被引量:48
  • 2赵建亭.深海半潜式钻井平台钻机配置浅析[J].船舶,2006,17(4):37-45. 被引量:12
  • 3刘海霞.深海半潜式钻井平台的发展[J].船舶,2007(3):6-10. 被引量:40
  • 4Hugh Mccrae. Marine riser systems and subsea blowout preventers[D]. Texas: University of Texas, 2003.
  • 5API RP16Q-2001/ISO 13624. Design and operation of rnarine drilling riser equipment[S]. 2001.
  • 6Rigzone. Semi Submersible drilling/production rig [EB/OL]. http://www.rigzone.com/market/Results.aspx?CategoryID= 2008-09-01/2008-12-31.
  • 7J. Guesnonl, Ch. Gaillardl and F. Richard. Ultra deep water drilling riser design and relative technology[J]. Oil & Gas Science and Technology, 2002, 57 (1): 39-57.
  • 8A S Westlake, K Uppu. Enabling solution for deepwater drilling riser management--A critical evaluation[R].OTC 18646. 2007.
  • 9Kieran Kavanagh, Michel Dib, Erm Balch. New revision of drilling riser recommended practice (API RP 16Q) [R]. OTC 14263.2002.
  • 10Ronalds B F. Deepwater Facility Selection [A]. Offshore Technology Conference [ C ], 2002.

共引文献52

同被引文献28

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部