摘要
通过对大孔径钢波纹管涵洞现场测试,得出管内不同角度应变的变化规律。结果表明:波峰、波谷和波侧在填土初期为拉应变,且部分角度产生力的重新分布,填土中期快速增长,而填土后期趋于平缓。随着角度的变化,波峰和波侧存在拉应变→压应变→拉应变的变化过程,而波谷正好相反,同时结合依托工程,给出了施工要点及注意事项。
Through field tests,the force characteristics of highway large-aperture steel bellows culverts are obtained.The test results show that the wave crests,troughs,and wave side are tensile strains at the initial stage of filling,and the force generated by some angles is redistributed,increasing rapidly in the middle of filling,and tending to be flat in the later stage of filling.As the angle changes,there is a process of tensile strain→compressive strain→tensile strain in wave crest and wave side,while wave trough is just the opposite.At the same time,the construction technology of highway large aperture steel corrugated pipe culvert is analyzed,and the construction key points and quality control measures are given.
作者
罗学睿
胡滨
何强
LUO Xuerui;HU Bin;HE Qiang(CCCC First Highway Consultants Co.,Ltd.,Shaanxi Xi'an 710075 China;CCCC Civil Engineering Science&Technology Co.,Ltd.,Shaanxi Xi'an 710075 China;Xi'an Technological University,Shaanxi Xi'an 710021 China)
关键词
大孔径
钢波纹管涵洞
应变分析
施工工艺
large aperture
steel corrugated culvert
strain analysis
construction technology