国际工程项目第三国设备采购管理

Equipment Procurement Management of Third Countries in International Engineering Projects
下载PDF
导出
摘要 海外工程项目应大环境而生,需要直面各种复杂的问题。设备制造周期长是影响项目工期的关键因素。为了响应总包合同的要求,自欧美采购动设备的情况变得更加复杂。文章就如何在启动采购之前识别风险,以及执行合同过程中需要注意的各种事项进行了总结并提出了建议。 Overseas engineering projects should be born in the big environment,and need to face all kinds of complicated problems directly.Because of the long equipment manufacturing cycle,it has become a key factor restricting the project time limit.In order to meet the requirements of the general contract,the situation of moving equipment purchased from Europe and America is even more complicated.This paper summarizes and puts forward some suggestions on how to identify risks before starting procurement and various matters needing attention in the process of contract implementation.
作者 赵曼 ZHAO Man(CNOOC Petrochemical Engineering Co.,Ltd.,Qingdao 266061,China)
出处 《化工管理》 2021年第24期27-28,共2页 Chemical Engineering Management
关键词 海外项目 工程总承包 动设备 采购 overseas projects general contracting of projects moving equipment purchase
  • 相关文献

参考文献1

二级参考文献4

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部