摘要 随着我国经济的不断发展,社会能源需求日益紧张,核能作为一种清洁的、可大规模发展的新型能源,已成为我国能源发展战略的一个重要选择。本文针对三代核电技术中的阀门类设备,在设计、制造过程中发生过的一些重要问题分析了原因,提出了解决的过程与方法,使相关企业在核电阀门采购生产时有针对性地进行质量控制。 With the continuous development of China's economy,social energy demand is increasingly tense,nuclear energy as a clean,large-scale development of new energy,has become an important choice of China's energy development strategy.This paper analyzes the causes of some important problems in the design and manufacturing process of valve equipment in the third generation nuclear power technology,and puts forward the solving process and methods,so that the relevant enterprises can carry out targeted quality control in the procurement and production of nuclear power valves.
作者 闫启亚 Yan Qiya(Shanghai Nuclear Engineering Research&Design Institute Co.Ltd,Shanghai 200000)
出处 《设备监理》 2021年第5期40-42,51,共4页 Plant Engineering Consultants
关键词 核电 阀门 设计 制造 Nuclear power Valves Design Manufacture
  • 相关文献

参考文献1

二级参考文献7

共引文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部