摘要
道路平交道口在运营期间,常见衔接不畅造成“跳车”现象,加之雨季排水汇集,导致车辆通行困难等问题频发。拟通过工程项目的实践管理,以项目实施效果为例,探讨在平交道口施工中的衔接重点以及排水措施,为类似项目提供参考,以实现平交道路的紧密衔接以及高效排水。
During operation of road level crossings,there are common problems of“jumping”caused by poor connection,and difficulty in vehicle traffic caused by congestion and overflow of drainage in the rainy season.Through practical management of the project and taking the implementation effect of the project as an example,it is proposed to discuss key points of connection and drainage measures in construction of level crossings,so as to provide reference for similar projects and realize close connection of level crossings and efficient drainage.
出处
《建筑技术开发》
2021年第16期125-127,共3页
Building Technology Development
关键词
市政道路
平交道口
排水系统
municipal road
level crossings
drainage system