摘要
结合多个VAV系统项目的实施经验,总结实施应用过程中的常见问题,阐述了包括VAV BOX选型、安装,VAV系统风管静压控制的策略,VAV风平衡调试等问题。
Based on the experience of several VAV system projects in the past,this paper summarizes the common problems encountered in the process of implementation and application of VAV system,including the selection and installation of VAV BOX,the static pressure control strategy of VAV system duct,VAV air balance debugging,etc.
出处
《建筑技术开发》
2021年第16期153-154,共2页
Building Technology Development
关键词
变风量空调系统
VAV
静压重设
风平衡
VAV air conditioning system
VAV
static pressure reset
air balance