期刊文献+

基于特征值屈曲分析的高墩大跨连续刚构桥稳定性研究 被引量:7

Study on Stability of High-pier Long-span Continuous Rigid-frame Bridge Based on Eigenvalue Buckling Analysis
下载PDF
导出
摘要 分析了1座山区高墩大跨连续刚构桥在施工期裸墩、最大悬臂阶段和成桥阶段不同结构体系状态下的稳定性差异。研究结果表明:裸墩状态下,风荷载对结构稳定的影响可以忽略;T构最大悬臂状态刚构桥稳定性风险最大,应重点控制施工误差及偶然因素的发生;墩间横系梁的设计对结构稳定性的贡献可以忽略。 The stability difference of a high-pier long-span continuous rigid-frame bridge in mountainous area under the different structural system states in the construction period of bare pier,the maximum cantilever stage and the completion stage of bridge is analyzed.The study results show that the influence of wind load on the stability of the structure can be ignored under the condition of bare pier.The stability risk of T-frame rigid frame bridge in the state of maximum cantilever is the biggest.The construction error and accidental factors should be controlled.The contribution in the design of tie beams between piers to the structural stability can be neglected.
作者 郭森 孟园英 GUO Shen;MENG Yuanying
出处 《城市道桥与防洪》 2021年第8期275-278,M0025,共5页 Urban Roads Bridges & Flood Control
关键词 连续刚构 施工阶段 成桥阶段 施工误差 偶然因素 稳定性 continuous rigid frame construction stage bridge completion stage construction error accidental factors stability
  • 相关文献

参考文献2

二级参考文献3

  • 1JTGD62—2004.公路钢筋混凝土及预应力混凝土桥涵设计规范[s].[S].,..
  • 2李国豪.桥梁结构稳定与振动[M].北京:中国铁道出版社,1991.
  • 3曾照亮.高墩计算长度探讨[J].中外公路,2008,28(5):160-162. 被引量:31

共引文献7

同被引文献30

引证文献7

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部