摘要
管片姿态超规范要求需拆除管片,以实际工程为例,研究在隧道内拆除隧道管片的施工技术。经研究最终采用了单轨吊车对拉的形式,安全、快捷地完成管片拆除,可为类似工程提供参考。
Due The segment attitude exceeds the specification requirements and the segment needs to be removed.The construction technology of demolishing tunnel segments in the tunnel is studied to provide a reference for similar projects.The results show the form of monorail crane opposite pulling is finally adopted to complete segment removal safely and quickly,which can provide a reference for similar projects.
出处
《建筑技术开发》
2021年第15期49-50,共2页
Building Technology Development
关键词
支撑
管片
拆除施工
support
segment
demolition construction