摘要 水电站具有规模大、施工工期长的特点,在建设全过程中对原地貌破坏易造成环境污染,环境保护与水土保持工作管理需要不断进行完善提高。为减少工程建设中对环境的破坏,以巴塘水电站环水保管理的实践,在电站总体规划设计、工程建设及科研试验等方面,探索出建设“绿色金上”、建设“绿色电站”的管理模式,可为新时代水电站生态环境管理提供参考。 Hydropower stations have the characteristics of large scale and long construction period.The destruction of the original landforms during the whole construction process can easily cause environmental pollution.The management of environmental protection and water and soil conservation needs to be continuously improved.In order to reduce damage to the environment during construction,this paper applies the environmental and water conservation management practices of Batang Hydropower Station to explore the management mode through which construction of"green enterprise"and"green power stations"can be realized from the aspects of overall planning,design,construction,scientific research and testing.The management mode provides reference for ecological environmental management of hydropower stations in the new era.
作者 牟遗忠 田应辉 阚思蒙 MOU Yizhong;TIAN Yinghui;KAN Simeng(Batang Branch of Huadian Jinsha River Upstream Hydropower Development Co., LTD,Chengdu,Sichuan,610041)
出处 《四川水力发电》 2021年第4期72-74,78,共4页 Sichuan Hydropower
关键词 巴塘水电站 绿色工程 生态保护 工程建设 Batang Hydropower Station green engineering ecological protection engineering construction
  • 相关文献

参考文献3

二级参考文献4

共引文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部