水电工程复杂岩石地层跟管钻孔预算定额编制及其应用 被引量:2

Compilation and Application of Budget Quota for Casing Drilling in Complex Rock Stratum of Hydropower Projects
下载PDF
导出
摘要 实测定额的编制,是定额观测数据转化为定额成果应用前的分析、处理过程,是保证定额成果质量的重要环节,应采用严谨科学的方法。以金沙江下游某水电站导流洞围堰预留岩硬跟管钻孔实测资料为基础,对水电工程复杂岩石地层跟管钻孔预算定额的编制过程进行实例分析和探讨,所得出的编制方法和编制成果,可供同行参考。 The compilation of the actual measurement quota is the process of analysis and processing before the quota observation data is converted into the quota result,and it is a key step to ensure the quality of the quota result,thus rigorous and scientific methods are required.Based on the measured data of casing drilling in the preserved rock in cofferdam of headrace tunnel of one hydropower station in the lower reaches of Jinsha River,this paper makes an example analysis and discussion on the compilation process of budget quota for casing drilling in complicated rock stratum of hydropower project.Compilation method and result in this paper can be referenced by similar projects.
作者 武洋 兰君 教波 吴后琳 WU Yang;LAN Jun;JIAO Bo;WU Houlin(Project Department of Baihetan Hydropower Station,China Three Gorges Group Co.,LTD,Liangshan,Sichuan,654602;Project Cost Estimation Center of China Three Gorges Group Co.,LTD,Chengdu,Sichuan,610000)
出处 《四川水力发电》 2021年第4期116-119,共4页 Sichuan Hydropower
关键词 跟管钻孔 观测数据 定额编制 成果应用 casing drilling observation data quota compilation:application of result
  • 相关文献

参考文献2

二级参考文献4

共引文献8

同被引文献19

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部