摘要
2020年1月,武汉不明原因肺炎感染人数激增,全市患者一床难求;中建三局等单位临危受命,牵头建设两座应急传染病医院,接收危重症患者。针对“新冠”肺炎应急医院建设节点特殊、工期紧、要求高以及环保要求更高,功能要求更全,设计任务繁重等问题,从设计、快速施工、污染防扩散和信息化方面开展攻关,实现了两座医院的快速建造。
In January 2020,the number of people infected with unexplained pneumonia in Wuhan surged,and it was even difficult to find a bed for patients in the whole city.China Construction Third Bureau and other units were ordered to take the lead in the construction of two emergency infectious disease hospitals to receive critically infected patients.In view of the special construction node,tight construction period,high quality requirements,higher environmental protection requirements,more complete functional requirements and heavy design tasks of the"COVID-19"emergency hospital,the two hospitals were built quickly by tackling key problems from the aspects of design,rapid construction,pollution prevention and diffusion,and information technology.
作者
黄捷
黄心颖
Huang Jie;Huang Xinying(General Contracting Company of China Construction Third Bureau Group Co.,Ltd.,Wuhan,430064)
出处
《建设科技》
2021年第13期63-68,共6页
Construction Science and Technology
关键词
火神山医院
雷神山医院
模块化设计
快速施工
污染防扩散
信息化
Huoshenshan Hospital
Leishenshan Hospital
modular design
rapid construction
non-proliferation of pollution
informatization