摘要 为了求解同时考虑模糊加工时间和模糊交货期的多目标置换流水车间调度问题,提出一种模糊多目标调度模型。针对目标之一的最大化满意度,考虑决策者偏好,建立基于悲观准则的偏好满意度模型,并在此基础上,兼顾考虑可信度,对满意度模型进行改进;针对Pareto最优解的选取,引入模糊集理论和概率论,运用面积补偿法将最大模糊完工时间去模糊化,便于可行解之间进行比较。最后,采用随机系列算例以及典型算例进行优化计算,计算结果验证了模型的有效性。 A fuzzy multi-objective model is proposed for the permutation flow shop scheduling with fuzzy processing time and fuzzy due date.As to the objective of satisfaction maximization,a preference satisfaction schedule model is set up based on pessimistic criterion.Then the model is modified in consideration of possibility.To select Pareto optimal solutions,the fuzzy set theory and probability theory are introduced.The results of fuzzy makespan are dealt with defuzzication based on area compensation,which makes the comparison of Pareto solutions easier.Random examples and one typical example are selected to conduct optimized calculation.The numerical results show the effectiveness of the model.
作者 陈可嘉 段瑞明 刘碧玉 周晓敏 CHEN Ke-jia;DUAN Rui-ming;LIU Bi-yu;ZHOU Xiao-min(School of Economics and Management, Fuzhou University, Fuzhou 350116, China)
出处 《运筹与管理》 CSSCI CSCD 北大核心 2021年第8期28-36,共9页 Operations Research and Management Science
基金 国家自然科学基金资助项目(71971064)。
关键词 模糊置换流水车间调度 悲观准则 面积补偿法 多目标优化 fuzzy permutation flow shop scheduling pessimistic criterion area compensation multi-objective optimization
  • 相关文献

参考文献5

二级参考文献55

  • 1喻海飞,汪定伟.食物链算法及其在供应链计划中的应用[J].系统仿真学报,2005,17(5):1195-1199. 被引量:8
  • 2喻海飞,汪定伟.食物链算法及其在分销网络优化中的应用[J].东北大学学报(自然科学版),2006,27(2):146-149. 被引量:6
  • 3卫忠,徐晓飞,邓胜春.多目标混合流水车间作业调度的演化算法[J].计算机集成制造系统,2006,12(8):1227-1234. 被引量:19
  • 4师瑞峰,周泓,上官春霞.混合递进多目标进化算法及其在flow shop排序中的应用[J].系统工程理论与实践,2006,26(8):101-108. 被引量:8
  • 5Zimmermann H J. Application of fuzzy sets theory to mathematical programming[J]. Information Science, 1985, 36: 29-58.
  • 6Chun J S, Jang H K, Hahn S Y. A study on comparison of optimization performances between immune algorithm and other heuristic algorithms[J]. IEEE Trans. on Magnetics, 1998, 34(5): 2972-2975.
  • 7Xu Z H, Gu X S. A Hybrid Method for Scheduling Problems of Flow Shop[ A]. In: Proceedings of the 5th World Congress on Intelligent Control and Automation, WCICA'04 [ C]. Hangzhou: the Institute of Electrical and Electronics Engineers, Inc, 2004. 4:2928-2932.
  • 8徐震浩 顾幸生.用模糊截集解决不确定条件下的具有中间存储时间有限的flow shop调度问题[A]..Proceedings of the 5th World Congress on Intelligent Control and Automation, WCICA''04[ C].Hangzhou: the Institute of Electrical and Electronics Engineers, Inc,2004.4.2923-2927.
  • 9ADAMOPPULOS G I,PAPPIS C P.A neighbourhoodbased hybrid method for scheduling with fuzzy due-dates[J].International Transactions in Operational Research,1998,5(2):147-153.
  • 10HONG-MING K,IFTEKHAR A K.Scheduling in serial multiproduct batch processes with finite interstage storage:a mixed integer linear program formulation[J].Industrial and Engineering Chemistry Research,1988,27 (10):1840-1848.

共引文献42

同被引文献17

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部