隧道近距离侧穿桩基础施工研究

Special Design for Major Risks of Tunnel Structure
下载PDF
导出
摘要 为了保证工程建设过程中安全防护工程和主体工程同时运行,确保建设项目在安全方面符合国家的有关法规、标准和规定。本文通过分析哈尔滨地铁3号线一期工程拟建项目的自然环境、施工过程、施工场地等,并辨识出了在一期建设过程中影响工程安全和环境安全的原因。本文对此提出了合理可行的安全技术,从而提高了工程项目建设过程中的安全性和工作效率,避免和减少了施工过程中的安全事故。 In order to ensure the parallel operation of the safety protection project and the main project in the process of project construction,and ensure that the safety of the construction project conforms to the relevant national laws and regulations,standards and regulations.This paper analyzes the natural environment,construction process and construction site of the first phase project of Harbin Metro Line 3,and identifies the reasons that affect the engineering safety and environmental safety in the first phase construction process.This paper puts forward reasonable and feasible safety technology for the main factors,so as to improve the safety and work efficiency in the construction process of the project,and avoid and reduce the safety accidents in the construction process.
作者 李跃强 LI Yueqiang(The First Engineering Co.,Ltd.of China Communications Third Public Bureau,Beijing,100012 China)
出处 《科技创新导报》 2021年第16期20-23,27,共5页 Science and Technology Innovation Herald
关键词 建设过程 施工安全 工作效率 安全技术 Construction process Construction safety Work eff iciency Security technology
  • 相关文献

参考文献4

二级参考文献26

共引文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部