摘要
结合宁波某污水处理厂粗格栅沉井施工,对异形大沉井的下沉施工技术进行了总结。通过对异形大沉井施工过程中的重难点进行分析,研究出了相应措施,通过对沉井在制作、下沉过程中的接高系数、下沉系数等稳定性要求进行验算,总结出了一套相对可靠的施工技术,可供类似工程借鉴。
Combined with the construction of coarse grid open caisson in a sewage treatment plant in Ningbo,the sinking construction technology of special-shaped large open caisson is summarized.Through the analysis on the key and difficult points in the construction process of the special-shaped large open caisson,the corresponding measures are studied.Through theoretical calculation,the stability requirements of connecting height coefficient and sinking coefficient in the production and sinking process of open caisson are checked,and a set of relatively reliable construction technology is summarized,which can be used as reference for similar projects.
作者
严邵峰
茅鸣
YAN Shaofeng;MAO Ming(Ningbo JiangongJianle Engineering Co.,Ltd.,Ningbo,Zhejiang 315020,China)
出处
《建筑施工》
2021年第8期1586-1588,共3页
Building Construction
关键词
异形大沉井
沉井施工
水下封底
稳定性分析
special-shaped large open caisson
open caisson construction
underwater bottom-sealing
stability analysis