摘要
本文通过对垃圾焚烧余热炉中旗式蒸发器管屏的制造方案及工艺技术进行总结,详细阐述了制造过程中采取的工艺措施和解决方法。
In this paper,the manufacturing scheme and technology of flag evaporator tube panel in waste incineration waste heat boiler are summarized,and the process measures and solutions adopted in the manufacturing process are described in detail.
作者
邓立鑫
王智颖
徐敏楠
DENG Li-xin;WANG Zhi-ying;XU Min-nan(Harbin Boiler Company Limited,Harbin 150046,China;State Key Laboratory of Efficient and Clean Coal-fired Utility Boilers(Harbin Boiler Company Limited)Harbin 150046,China)
出处
《锅炉制造》
2021年第5期53-54,64,共3页
Boiler Manufacturing
关键词
余热炉
旗式蒸发器
工艺
Waste Heat Boiler
Flag Evaporator
Technology