基于挣值法与AHP的工程进度及成本研究

Research on Project Schedule and Cost Based on Earned Value Method and AHP
下载PDF
导出
摘要 将挣值法与AHP方法进行组合来分析工程项目的成本及进度管理。首先,介绍工程项目成本及进度管理的理论基础及方法;其次,运用挣值法分析工程项目的成本及进度管理,并运用AHP方法找出影响工程项目成本及进度的关键影响因素;最后,针对关键影响因素采取纠偏措施调整项目进度及成本偏差。 This paper is combining the earned value method and AHP method to analyze the cost and schedule management of engineering projects.Firstly,This paper is introducing the theoretical basis and methods of project cost and schedule management;secondly,This paper is using earned value method to analyze the cost and schedule management of the project,and using the AHP method to find out the key factors affecting the cost and schedule of the project;finally,This paper is focusing on the key influencing factors adopt corrective measures to adjust the project schedule and cost deviation.
作者 谢梅玉 孙凤阁 万涛 XIE Mei-yu;SUN Feng-ge;WAN Tao(Beijing Xinke Engineering Management Consulting Co.,Ltd.,Beijing 100000,China;Water Affairs Bureau of Shunyi District,Beijing,Beijing 100000,China)
出处 《价值工程》 2021年第27期45-47,共3页 Value Engineering
关键词 AHP方法 挣值法 成本管理 进度管理 AHP method earned value method cost management schedule management
  • 相关文献

参考文献1

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部