期刊文献+

风电超高混凝土塔筒体内预应力施工及监测技术研究 被引量:2

Research on prestressed construction and monitoring technology in Ultra-high concrete tower of wind power
下载PDF
导出
摘要 当前,风电塔筒主要采用钢塔筒或者钢混组合塔筒结构形式,超高型混凝土塔筒作为一种新的结构形式,由于其能够有效地提升整机发电量、降低维护成本,得到快速的发展及推广应用。本文结合新疆哈密某风电场工程项目,对超高混凝土塔筒体体内预应力施工及监测技术应用进行了研究,可为类似结构提供参考。 At present,wind power tower drum mainly adopts the structure form of steel tower drum or steel-concrete composite tower drum.As a new structure form,ultra-high concrete tower drum is rapidly developed and applied because it can effectively improve the power generation of the whole machine and reduce the maintenance cost.Combined with a wind power plant project in Hami,Xinjiang,this paper studies the application of prestress construction and monitoring technology in the body of ultra-high concrete tower cylinder,which can provide reference for similar structures.
作者 黄汉斌 简铃方 王波 王雄彪 彭渝舒 王晓琳 HUANG Hanbin;JIAN Lingfang;WANG Bo;WANG Xiongbiao;PENG Yushu;WANG Xiaolin(Liuzhou OVM Machinery Co.,Ltd.,Liuzhou,Guangxi Zhuang Autonomous Region,545006 China)
出处 《科技创新导报》 2021年第17期4-6,共3页 Science and Technology Innovation Herald
关键词 高层建筑 框架结构 无缝钢管 管棚加固 Wind power Ultra-high concrete tower Prestressed construction Monitoring technology
  • 相关文献

参考文献3

二级参考文献7

共引文献7

同被引文献10

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部