期刊文献+

预应力混凝土连续箱梁桥加固技术研究 被引量:3

Study on strengthening technology of prestressed concrete continuous box girder bridge
下载PDF
导出
摘要 文章通过对一座特大预应力混凝土连续箱梁桥加固为工程背景,从病害成因、加固措施、体外预应力施工技术等方面,对加固前后的效果进行了分析与对比。结果表明,加固效果明显,加固后桥体的极限承载能力有较大提高,整体工作性能有明显改善。 Based on the engineering background of a large prestressed concrete continuous box girder bridge,this paper analyzes and compares the effects before and after reinforcement from the aspects of disease cause analysis,reinforcement measures,external prestressing construction technology.The results show that the effect of reinforcement is obvious,the ultimate bearing capacity of the bridge body is greatly improved,and the whole working performance is obviously improved.
作者 胡欣 Xin Hu(Wuhan Technical College of Communications,Wuhan 430000,China)
出处 《青海交通科技》 2021年第2期103-105,共3页 Qinghai Transportation Science and Technology
基金 湖北省教育厅科技处科学研究计划(B2018491)
关键词 预应力混凝土 连续箱梁桥 体外预应力 加固 prestressed concrete continuous box girder bridge external prestressing strengthening technology
  • 相关文献

参考文献3

二级参考文献7

共引文献17

同被引文献13

引证文献3

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部