摘要
地铁开辟了城市的地下空间,减轻了地面上的拥挤。地铁建设已成为21世纪中国城市基础设施、城市交通的主要形式,伴随地铁的迅速发展,地铁施工给城市带来的压力越来越大,盖挖逆作法大幅缩减了地铁施工的占道时间,而钢管桩施工是盖挖逆作中的关键工序。
The metro has opened up underground space of city and reduced congestion on ground.Metro construction has become main form of urban infrastructure and urban traffic in China in the 21st Century with rapid development of metro.Metro construction brings more and more pressure to urban traffic.The cut-and-cover top-down method greatly reduces time of metro construction,and the steel pipe column construction is the key process in the cut-and-cover top-down method.
作者
刘忠华
陈浩
Liu Zhong-hua;Chen Hao
出处
《建筑技术开发》
2021年第18期78-80,共3页
Building Technology Development
关键词
地铁施工
盖挖逆作
钢管柱
metro construction
cut-and-cover top-down
steel pipe column