期刊文献+

超长垃圾贮坑厂房温度应力分析及预应力设计实践 被引量:2

Analysis on Temperature Stress and Practice of Prestressed Design in Extra-length Garbage Pit Plant
下载PDF
导出
摘要 超长结构在混凝土收缩和温度变化的影响下,容易产生较大裂缝,从而影响结构的适用性和耐久性。以某超长垃圾贮坑厂房实际工程为例,对超长结构垃圾贮坑厂房受力特点进行分析,提出温差及温度应力的计算方法,总结预应力技术解决超长构件温度和收缩应力的方法和优势。 It is easy to produce large cracks of extra-length structures under influence of concrete shrinkage and temperature changes,thus affecting applicability and durability of the structure.Take actual project of an extra-length garbage pit plant as an example,the stress characteristics of extra-length structure were analyzed,and suggestions for the calculation of temperature difference and temperature stress were put forwarded,and the methods and advantages of prestressing technology to solve temperature and shrinkage stress of extra-length structure were analyzed and summarized.
作者 方娥 康仲录 康钦禄 Fang E;Kang Zhong-lu;Kang Qin-lu
出处 《建筑技术开发》 2021年第17期15-16,共2页 Building Technology Development
关键词 超长厂房 温度应力 预应力 extra-length plant temperature stress prestress
  • 相关文献

参考文献5

二级参考文献19

共引文献27

同被引文献12

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部