在化工项目建设过程中,设备工程造价编制工作是一个关键环节,而非标设备作为工程造价编制中占比较高的一项,做好非标设备工程造价编制工作对节省项目投资十分重要。文章对化工项目非标设备制作安装所产生费用的3种计算方法进行了介绍,分别为估算法、快速报价法、国家定额预算报价,分析了在进行非标设备的工程造价编制时的主要影响因素,包括设备的选材、设备结构、设备工作压力、设备生产规格还有生产的批量等。
Equipment engineering cost compilation is a key point in the process of chemical project construction,and non-standard equipment project cost compilation is relatively higher.The project cost of non-standard equipment compilationis is very important to save project investment.This article introduces three kinds of cost calculation methods of non-standard equipment production and installation,which are respectively the estimation method,the rapid quotation method and the national quota budget quotation method.It analyzes the main factors to influence non-standard equipment project cost compilation,including equipment material selection,equipment structure,working pressure,equipment specif ications and production batch,etc.It provides reference for equipment manufacturers,project construction units to rationally allocate and use construction funds and improve the utilization rate of funds.
作者
张妍
和勇
ZHANG Yan;HE Yong(Shenyang Northeast Pharmaceutical Equipment Manufacturing and Installation Co.,Ltd.,Shenyang 110026,China;Shenyang Original Chemical Co.,Ltd.,Shenyang 110026,China)
出处
《化工管理》
2021年第26期3-4,共2页
Chemical Engineering Management
关键词
化工项目非标设备
工程造价编制
影响因素
chemical project non-standard equipment
engineering cost compilation
influence factors