摘要
如何提高体育设施的使用效率一直是城市发展过程中的热点问题,本文以上海四家大型公共体育设施为研究对象,总结出影响大型公共体育设施的五项因素,并提取相关数据,通过引入多投入—多产出的DEA评价模型,评估各因素在使用效率中的占比权重,分析各家体育设施的设计策略与效率之间的联系,为公共体育设施的规划与建设提供理论支撑和策略建议。
How to improve the utilization of public sports facilities has always been a concern in the process of urban development.This paper takes four large-scale public sports facilities companies in Shanghai as the research object,summarizes five factors that affect large-scale public sports facilities,and extracts relevant data.By introducing a multi-input-multi-output DEA evaluation model,the utilization efficiency of each factor is evaluated.Then it analyzes the relationship between the design strategy and efficiency of various sports facilities,and provides theoretical support and strategic suggestions for the planning and construction of public sports facilities.
作者
赵艺佳
Zhao Yijia(Tongji Architectural Design(Group)Co.,Ltd.,Shanghai 200092,China)
出处
《城市建筑》
2021年第24期121-124,共4页
Urbanism and Architecture
关键词
公共体育设施
使用效率
DEA评价模型
public sports facilities
utilization efficiency
DEA evaluation model