摘要
安徽省长江崩岸应急治理工程建设包括水下抛石护岸、铰链沉排护岸、水上预制块护坡等内容,工程战线长、范围广,对此应加强施工质量控制、提升工程管理水平,只有这样才能有效提高水利工程的社会及经济效益。
The construction content of Yangtze River bank collapse emergency treatment project in Anhui province includes underwater riprap revetment,hinge sedimentation revetment and prefabricated block revetment.The project is wide in construction range and long in construction period.This paper mainly expounds the quality control measures adopted in the construction process to achieve the expected quality effect.
作者
潘世龙
PAN Shi-long(Yangtze River Management Bureau of Anhui Province,Wuhu,Anhui 241002,China)
出处
《广东水利电力职业技术学院学报》
2021年第3期24-27,55,共5页
Journal of Guangdong Polytechnic of Water Resources and Electric Engineering
关键词
长江河道
崩岸治理
质量控制
质检效果
Yangtze River
bank failure treatment
quality control
quality conclusion
effect analysis