摘要 针对隧道二衬拱顶脱空问题,依托厦深铁路梅林隧道工程实例,从混凝土本身、设备及环境三方面对硬岩隧道拱顶脱空的原因进行了探讨,并对脱空导致的潜在风险进行了总结。随后提出硬岩隧道拱顶脱空分级整治措施,该措施按照脱空程度的不同采取小、中、大修三种处理措施:小修直接灌注混凝土;中修打锚杆+灌注混凝土;大修开天窗+植筋+打锚杆+灌注混凝土。最后结合梅林隧道典型断面采用有限元分析论证了分级整治措施的有效性,可为类似工程提供参考。 Aiming at the problem of the vault void of the secondary lining of the tunnel,relying on the Meilin tunnel project of Xiamen-Shenzhen Railway,the reasons for the vault void of the hard rock tunnel are discussed from three aspects:concrete itself,equipment and environment.And the potential risks caused by voiding are summarized.Subsequently,the grading treatment measures for the vault void of the hard rock tunnel are proposed.This measure adopts three treatment methods for small,medium and large repairs according to the degree of voiding:direct pouring concrete for small repairs;bolting+pouring concrete for medium repairs;opening skylights+planting bars+anchoring rods+pouring concrete for overhauling.Finally,combined with the typical section of the Meilin Tunnel,finite element analysis is used to demonstrate the effectiveness of the hierarchical treatment measures,which can provide a reference for similar projects.
作者 刘文俊 LIU Wenjun(China Railway 12^(th)Bureau Group 2^(nd)Engineering Co.Ltd.,Taiyuan Shanxi 030032,China)
出处 《铁道建筑技术》 2021年第9期134-139,共6页 Railway Construction Technology
基金 中铁十二局集团第二工程有限公司科技计划(二公司2016研-28号)。
关键词 铁路隧道 衬砌空洞 安全系数 整治措施 railway tunnel lining cavity safety factor treatment measures
  • 相关文献

参考文献12

二级参考文献70

共引文献269

同被引文献39

引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部