装配式建筑转换层施工技术要点 被引量:2

KEY POINTS OF CONSTRUCTION TECHNOLOGY FOR TRANSFER LAYER OF PREFABRICATED BUILDING
下载PDF
导出
摘要 北京市海淀区某装配式建筑项目转换层施工中,因预留预埋及钢筋定位精准度较差影响了施工进度和工程质量。经分析制订了斜支撑套筒预埋、主筋定位控制要点;通过制作钢筋整位钢板、定位并在混凝土浇筑过程中采取成品保护等措施,解决了主筋及预埋件偏位问题,提高了构件安装效率。 In the construction of transfer layer of a prefabricated building project in Haidian District of Beijing,the construction progress and engineering quality were affected by the poor accuracy of reserved burying and steel bar positioning.The key points of pre-buried inclined support sleeve and positioning control of main reinforcement were formulated;by making steel integral plate,positioning and adopting finished product protection in concrete pouring process,the deviation of main reinforcement and embedded parts was solved,and the installation efficiency of components was improved.
作者 申耀杰 王亚楠 梁旭 王春雷 韩冰 SHEN Yao-jie;WANG Ya-nan;LIANG Xu;WANG Chun-lei;HAN Bing(BCEG Advanced Construction Materials Technology Inc.,102600,Beijing,China;BCEG Advanced Construction Materials Co,.Ltd.,100015,Beijing,China)
出处 《建筑技术》 2021年第9期1097-1099,共3页 Architecture Technology
关键词 装配式结构 钢筋定位 钢筋预留 fabricated structure steel bar positioning steel bar reservation
  • 相关文献

参考文献3

二级参考文献3

共引文献45

同被引文献9

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部