期刊文献+

BIM技术在水泥厂预热器塔架建设中的应用

Application of BIM Technology in the Construction of Pre-Heater Tower in Cement Plant
下载PDF
导出
摘要 水泥预热器塔架作为一种典型的工业建筑结构,有着管线分布复杂、设备布置密集的特点。本文在某水泥塔架建设的工程背景下,从设计、施工以及信息管理平台三个角度,提出并评价BIM技术可行的应用点。结果表明,BIM在水泥塔架建设的设计阶段主要发挥专业协同、碰撞检测以及快速算量的作用,在施工阶段主要从避免空间冲突的角度进行场地和工序的优化,通过外接数据库和轻量化协同平台的方式可以构建BIM信息管理平台,实现信息集成和共享。 As a typical industrial building structure in cement plant,the pre-heater tower has the characteristics of complex pipeline distribution and dense equipment layout.In this paper,the application of BIM technology in the construction of the pre-heater tower was discussed and evaluated from three aspects of design,construction and information management platform.In the design phase,BIM technology mainly plays the role of domains collaboration,collision detection and rapid calculation of engineering quantity.In the construction phase,the construction site layout and construction sequence were optimized to avoid spatial conflicts.Based on BIM technology,an information management platform could be developed through an external database and a lightweight collaboration platform to achieve information integration and sharing.
作者 崔兵 尹越 李顺 Cui Bing;Yin Yue;Li Shun(College of Management and Economics,Tianjin University,Tianjin 300072,China;School of Civil Engineering,Tianjin University,Tianjin 300350,China;Tianjin Cement Industry Design&Research Institute Co.,Ltd.,Tianjin 300400,China)
出处 《土木建筑工程信息技术》 2021年第4期46-52,共7页 Journal of Information Technology in Civil Engineering and Architecture
关键词 BIM 预热器塔架 设计 施工 信息管理 BIM Pre-Heater Tower Design Construction Information Management
  • 相关文献

参考文献7

二级参考文献35

  • 1张绪松,谢宜,刘晓波.BIM技术在三亚新海干部疗养基地设计中的应用(连载二)[J].土木建筑工程信息技术,2013,5(1):75-84. 被引量:9
  • 2伍建军,周丹丹,饶伟,胡俊杰,吴侃.基于BIM技术的造价软件对比分析[J].土木建筑工程信息技术,2013,5(4):29-33. 被引量:21
  • 3邱奎宁,王磊.IFC标准的实现方法[J].建筑科学,2004,20(3):76-78. 被引量:24
  • 4葛雁平,姜卫杰.面向对象技术在建筑信息模型中的应用[J].山东建筑工程学院学报,1995,10(2):82-85. 被引量:4
  • 5H Edward Goldberg. AEC From the Ground Up:The Building Information Model[J].CADalyst Eugene,2004.56-58.
  • 6Faraj I,Alshawi M,Aouad G,Child T,Underwood J. Industry foundation classes Web-based collaborative construction computer environment:WISPER[J].Automation in Construction,2000.79-99.
  • 7Halfawy,Mahmoud M.R,Froese,Thomas M. Component-based framework for implementing integrated architectural/engineeringc/construction project systems[J].Journal of Computing in Civil Engineering ASCE,2007.441-452.
  • 8张建平;张洋;张新.基于IFC的BIM及其数据集成平台研究[A]浙江杭州,2008227-232.
  • 9Kam,Calvin,Fischer,Martin,Hanninen,Reijo,Lehto,Seppo,Laitinen,Jarmo. Implementation challenges and research needs of the IFC interoperability standard:Experiences from HUT-600 construction pilot[R].American Society of Civil Engineers.Washington,DC,United states,2002.
  • 10Pazlar,Tomaz,Turk,Ziga. Interoperability in practice:Geometric data exchange using the IFC standard[J].Electronic Journal of Information Technology in Construction,2008.362-380.

共引文献340

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部