期刊文献+

基于虚拟变量法的某连续梁桥施工期可靠性分析

Reliability Analysis of a Continuous Girder Bridge during Construction Based on Dummy Variable Method
下载PDF
导出
摘要 连续梁桥一般采用悬臂浇筑进行施工,各施工阶段浇筑完成的悬臂构件可靠性都能够对下一施工阶段可靠性造成影响,进而影响到整个桥梁的建造安全性。以湘水大桥为工程背景,以主梁,墩柱,桩基结构、临时固结系统作为结构的失效模式,在充分考虑工程实际的基础上,基于虚拟变量法对各施工阶段可靠指标进行计算,进而计算了整个施工期的体系可靠度。计算结果表明:每个施工阶段主梁及各截面可靠度指标幅度变化相对较大,而临时固结系统及桩基础的可靠度指标幅度变化表较小,整个施工期的体系失效概率P_(f)=0.0015。 Continuous girder bridge is usually constructed by cantilever casting,and the reliability of cantilever components completed in each construction stage can affect the reliability of the next construction stage,and then affect the construction safety of the whole bridge.This paper takes a continuous girder bridge as the engineering background,main girder,pier column,pile foundation structure and temporary consolidation system as the failure mode of the structure.On the basis of fully considering the engineering practice,the reliability index of each construction stage is calculated based on the dummy variable method,and then the system reliability of the whole construction period is calculated.The calculation results show that the reliability index range of the main girder and each section varies relatively greatly in each construction stage.But the range of reliability index of temporary consolidation system and pile foundation is small.System failure probability during the entire construction period P_(f)=0.0015.
作者 李学红 陈双庆 LI Xue-hong;CHEN Shuang-qing(Hunan Shunchang Construction Co.,Ltd.,Changde,Hunan 415000,China;Hunan University of Arts and Science,Changde,Hunan 415000,China)
出处 《黑龙江交通科技》 2021年第10期84-86,共3页 Communications Science and Technology Heilongjiang
关键词 虚拟变量法 连续梁桥 施工期 可靠性 dummy variable method continuous girder bridge during the construction reliability
  • 相关文献

参考文献2

二级参考文献5

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部