增加临时对拉装置拆除系杆拱桥的施工技术 被引量:1

Construction Technique for Removing the Tied Arch Bridge by Adding a Temporary Opposite Pulling Device
原文传递
导出
摘要 为解决系杆拱桥在先系杆、后拱肋拆除过程中产生的拱肋水平推力平衡问题,在系杆拱桥拱肋端部增加临时对拉装置,先拆除系杆,利用增加的临时对拉装置承受拱肋端部的水平推力,使拱肋在系杆拆除后处于平衡稳定状态,再拆除拱肋,实现了系杆和拱肋依次吊装拆除。该施工技术无需在航道上搭设支架,拱肋和系杆也无需分段拆除,为系杆拱桥的拆除提供了新思路和技术参考。 In order to solve the problem of the horizontal thrust balance of the arch ribs during the removal of the tied bars after bar tying of the tied arch bridge,a temporary opposite pulling device is added at the end of the arch ribs of the tied arch bridge.The tie bars are first removed and then the additional temporary opposite pulling device is used to bear the horizontal thrust at the end of the arch rib,so that the arch rib is in a balanced and stable state after the tie bar is removed,and then the arch rib can be removed smoothly.Therefore,the lifting and removal of the tied bar and the arch rib in sequence can be realized easily.The main construction process and key points are introduced.There is no need to set up brackets in the waterway with the technique,and the arch ribs and tie bars do not need to be removed in sections,which provides a new idea and technical reference for the removal of tied arch bridges.
作者 丁玉春 DING Yu-chun(Jiangsu Provincial Transportation Engineering Group Co.Ltd.,Zhenjiang 212100,China)
出处 《公路》 北大核心 2021年第9期192-196,共5页 Highway
关键词 系杆拱桥 临时对拉 拆除 系杆 拱肋 施工技术 tied arch bridge temporary opposite pulling removal tied bar arch rib construction technique
  • 相关文献

参考文献4

二级参考文献10

共引文献6

同被引文献13

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部