摘要 针对单部件系统/关键部件提出视情维修与备件订购联合策略,其中系统退化服从两阶段延迟时间过程且采用非周期检测策略,退化初期以检测间隔T1检查系统状态,而在第一次识别缺陷状态时,缩短检测周期为T2、订购备件且进行不完美维修;若系统在随后的退化中被识别处于缺陷状态,执行不完美维修直至超过阈值次数Nmax并采取预防性更换,但若在检测周期内发生故障则进行更换。根据系统状态和备件状态分析各种可能更新事件及相应的联合决策,利用更新报酬理论构建最小化单位时间内期望成本的目标函数,优化T1,T2,Nmax。与对比模型策略相比,算例结果表明所提出的联合策略能有效降低单位时间内的期望成本。 A jointly policy of condition-based maintenance(CBM)and spare ordering is proposed for a single-unit system/critical component subject to a two-stage delay-time process.A non-periodic inspection policy with various intervals is presented,in which the system is detected with the relatively longer interval T1 during the initial deterioration process,but with a shorted interval T2 after the defective state is firstly found by an inspection.While,the spare is ordered and imperfect maintenance(IPM)is carried out.In the subsequent deterioration process,IPM is required and performed once the defective state is revealed until the number of IPM exceeds the threshold Nmax;then,a preventive replacement is needed.If a failure occurs within the inspection interval,a corrective replacement arises.According to the system’s state and the spare’s availability,all possible renewal events and the corresponding joint decisions are discussed and then the objective function to minimize the expected cost per unit time is established using the renewal award theorem for optimizing T1,T2,Nmax.The results fromthe numerical example indicate that the proposed policy decreases the expected cost per unit time compared to the comparative models.
作者 赵斐 康建设 王雷震 张新辉 张建 ZHAO Fei;KANG Jian-she;WANG Lei-zhen;ZHANG Xin-hui;ZHANG Jian(School of Business Administration, Northeastern University, Shenyang 110819, China;Equipment Command and Administration Department, Shijiazhuang Campus of Army Engineering University, Shijiazhuang 050003, China;CRRC Tangshan Co. , Ltd. , Tangshan 063000, China)
出处 《运筹与管理》 CSSCI CSCD 北大核心 2021年第9期31-37,共7页 Operations Research and Management Science
基金 国家自然科学基金资助项目(71701038) 教育部人文社会科学研究一般项目(16YJC630174) 河北省自然科学基金资助(G2019501074) 中央高校基本科研业务专项资金(N2123019)。
关键词 状态维修 非周期检测 不完美维修 备件订购 延迟时间 condition-based maintenance non-periodic inspection imperfect maintenance spare ordering delay-time
  • 相关文献

参考文献5

二级参考文献30

  • 1刘宝友,方攸同,魏金祥,王永亮.状态维修机械设备的可靠性和检测更换策略[J].机械工程学报,2006,42(3):30-35. 被引量:20
  • 2Noortwijk J.A survey of the application of gammaprocesses in maintenance. Reliability Engineering . 2009
  • 3Wang W.A model to predict the residual life ofrolling element bearings given monitored conditionmonitoring information to date. IMA J Manage-ment Mathematics . 2002
  • 4Wang W.Modelling the probability assessment ofthe system state using available condition informa-tion. IMA J Management Mathematics . 2006
  • 5Fouladirad M,Grall A,Dieulle L.On the use of on-line detection for maintenance of gradually deterio-rating systems. Reliability Engineering and Sys-tem Safety . 2008
  • 6Wang W,Zhang W.Early defect identification:ap-plication of statistical process control methods. Journal of Quality in Maintenance . 2008
  • 7Christer,A.H.Developments in delay ti me analysisfor modelling plant maintenance. The Journal of theOperational Research Society . 1999
  • 8Wang W.A two-stage prognosis model in condition based maintenance. European Journal of Operational Research . 2007
  • 9B. Saassouh,L. Dieulle,A. Grall.Online maintenance policy for a deteriorating system with random change of mode. Relia-bility Engineering and System Safety . 2007
  • 10Wang L,Chu J,Mao W.A condition-based replace-ment and spare provisioning policy for deterioratingsystems with uncertain deterioration to failure. European Journal of Operational Research . 2009

共引文献36

同被引文献35

引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部