摘要 一350 MW超临界锅炉投产后,一直存在再热器减温水量大及冷灰斗结焦严重等问题。通过一系列的调整试验,总结出现问题的主要原因是炉底漏风量较大,热二次风箱压力偏低,再热器设计面积偏大,1号、3号角冷灰斗区域加装了耐磨浇注料等,并提出了优化改进措施。 A 350 MW supercritical boiler existed excessive reheater attemperating water and ash hopper slagging after putting into production.Through a series of adjustment tests,it was concluded that the main reasons for the problems were the large boiler bottom air leakage,the low pressure of hot secondary air box,the large designed area of reheater,adding of wear-resistant castables in the No.1 and No.3 cool slag hopper area and etc.,and put forward the optimization and improvement measures.
作者 刘法志 吴桂福 顾春阳 李沙 LIU Fazhi;WU Guifu;GU Chunyang;LI Sha(Huadian Electric Power Research Institute Co.,Ltd.,Hangzhou 310030,Zhejiang,China;Ili Coal Electricity Co.,Ltd.,State Grid Energy Development Company,Ili 835000,Xinjiang,China)
出处 《能源与节能》 2021年第9期103-107,共5页 Energy and Energy Conservation
关键词 再热器 减温水量 冷灰斗结焦 炉底漏风 热二次风箱压力 reheater attemperating water cool slag hopper slagging boiler bottom air leakage pressure of hot secondary air box
  • 相关文献

参考文献7

二级参考文献66

共引文献46

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部