摘要
进行宾水西道延长线跨津沧高速立交桥上构连续梁支架现浇施工时,通过采用新型支架、方案优化及经济比较分析,达到了技术可行、经济合理的最优目标。
During the cast-in-situ construction of the continuous beam support of the upper structure of the Binshui West Road extension line across the Jin-Cang express overpass,the optimal goal of technically feasible and economically reasonable was achieved through the use of new supports,scheme optimization and economic comparison analysis.
作者
侯佳莹
HOU Jia-ying(China Railway First Bureau Group Tianjin Construction Engineering Co.,Ltd.,Tianjin 300000,China)
出处
《价值工程》
2021年第29期101-103,共3页
Value Engineering
关键词
连续梁支架现浇
盘扣式钢管支架
成本控制
施工关键技术
验算
cast-in-situ continuous beam support
disc-buckle steel pipe support
cost control
key construction technology
check calculation