莫莫克水利枢纽工程为河流控制性工程,主要承担发电、防洪、灌溉任务。水库为中(3)型工程,电站设计保证率为90%,根据工程特点采用发电机电压侧扩大单元接线,110 k V侧单母线接线方式设计,确保了工程经济、长效、稳定运行。文章主要阐述工程任务和主要设计内容,为其他同类项目提供参考借鉴。
The Momoke Water Conservancy Project is a river control project. It is mainly responsible for power generation,flood control and irrigation.The reservoir is a medium Ⅲ type project. The design guarantee rate of the plant is 90%. According to the characteristics of the project,the generator voltage side expansion unit wiring is adopted. The 110 kV side single bus configuration method are designed to ensure the economic,long-term and stable operation of the project. The project tasks and main design content are mainly described in this paper,which provide reference for other similar projects.
作者
黄志明
HUANG Zhiming(Xinjiang Water Resources and Hydropower Survey,Design and Research Institute,Urumqi 830000,China)
出处
《河南水利与南水北调》
2021年第7期65-66,共2页
Henan Water Resources & South-to-North Water Diversion
关键词
莫莫克水利枢纽
灌溉设计
扩大单元接线
Momoke Water Conservancy Project
irrigation design
expansion unit connection