摘要
甘肃省人民医院7#楼、8#楼在深基坑支护降水过程中采用咬合桩+预应力锚索,通过导板定位、咬合桩硬切割和测斜技术应用,保证了饱和砂岩层深基坑施工安全,提高了经济效益和社会效益,可为同类项目提供借鉴。
The 7#and 8#buildings of the People's Hospital of Gansu Province used occlusal piles+prestressed anchor cables in the process of deep foundation pit support and dewatering,which guaranteed the safety of deep foundation pit construction in saturated sandstone layer through guide plate positioning,hard cutting of occlusal piles and application of inclinometer technology,improved economic and social benefits,and could provide reference for similar projects.
作者
靳高明
包胜昔
王宝成
JIN Gaoming;BAO Shengxi;WANG Baocheng(Gansu Construction Investment Construction Co.,Ltd.,Lanzhou Gansu 730050)
出处
《河南科技》
2021年第16期47-49,共3页
Henan Science and Technology
基金
甘肃省住房和城乡建设厅科研项目“第三系强风化砂岩物理力学特性与基坑支护、降水关键技术研究”(JK2020-03)。
关键词
饱和砂岩层
深基坑
咬合桩
预应力锚索
saturated sandstone layer
deep foundation pit
occluding pile
prestressed anchor cable