针对农村生活污水收集处理项目复杂性、特殊性以及不确定性的问题,以巢湖流域罗埠村农村生活污水治理项目为例,按照施工进场前、进场后和施工过程中3阶段对工程进行了优化设计,并探讨了罗埠村生活污水工程优化设计路径。结果表明:通过优化设计降低了工程建设成本,减少了工程返工或停工风险,保障了建设周期可控。
Targeting the complexity,particularity,and uncertainty of domestic sewage collection and disposal in rural areas,this thesis sets the Luobu village in Chaohu basin as an example.The optimization design of the project is carried out according to the three stages:before,after and during the construction,and the optimization design path of Luobu village domestic sewage engineering is discussed.The results show that the optimization design reduces the project construction cost,reduces the risk of project rework or shutdown,and ensures that the construction cycle is controllable.
作者
梅才华
蔡华
张磊
鲍习照
韦润泽
黄伟
MEI Caihua;CAI Hua;ZHANG Lei;BAO Xizhao;WEI Runze;HUANG Wei(College of Civil and Architecture Engineering,Chuzhou University,Chuzhou,Anhui 23900,China;Anhui Zhongchang Ecological Engineering Construction Co.,Ltd.,Hefei,Anhui 230000,China;Nanjing Municipal Design and Research Institute Co.,Ltd.,Nanjing,Jiangsu 210008,China)
出处
《湖南城市学院学报(自然科学版)》
CAS
2021年第5期32-36,共5页
Journal of Hunan City University:Natural Science
基金
安徽省重点研究与开发计划项目(202004i07020010)
安徽省教育厅科研项目(KJ2020B11)。
关键词
农村生活污水
优化设计
优化路径
影响分析
rural domestic sewage
optimization design
optimization path
impact analysis