新建县局机房配套建设方案探讨

下载PDF
导出
摘要 为满足基站接入和全业务运营下各类业务接入的要求,面对4G、5G、集团客户、家庭宽带业务等综合业务的快速发展,面对中国移动分营县局空间、电源受限的问题,多地已开展第二县局机房的建设。如何合理规划机房平面,建设电源、空调等配套系统以满足各类网元长期的发展需求,成为机房建设中需要考虑的重点问题。 In order to meet the requirements of base station access and various services access under full service operation,in the face of the rapid development of integrated services such as 4G,5G,group customer services and home broadband services,as well as the limited space and power supply of China Mobile's county communication stations,the construction of the second county communication stations has begun in many places.How to plan the layout of the communication room,construct the power system,air conditioner and the other supporting systems which can satisfy the long-term development requirements of various network elements has become a key issue to be considered in the construction of communication room.
作者 黄诚
出处 《现代传输》 2021年第5期56-58,共3页 Modern Transmission
关键词 平面布置 设备排列 走线架 电源 空调 layout planning equipment arrangement cable rack power supply air conditioner
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部