摘要
湖北省武穴市位于长江中下游北岸,武黄湖泵站工程区域处于长江冲积平原的一部分,该区域地势低平,汛期常受涝水侵害。本文介绍了项目区域内排涝现状及存在的问题,结合历史降雨数据,通过计算公式分析区域内所需的排涝流量,为泵站后续相关设计提供重要支撑。
Wuxue City in Hubei Province is located on the north bank of the middle and lower reaches of the Yangtze River.The Wuhuang Lake Pumping Station project area is part of the alluvial plain of the Yangtze River.This article introduces the current situation and existing problems of flood drainage in the project area,combined with historical rainfall data,and analyzes the required flood drainage flow in the area through calculation formulas,providing important support for the subsequent related design of the pumping station.
作者
陈晖
周志雄
Chen Hui;Zhou Zhi-xiong(Water Conservancy and Lakes Bureau of Wuxue City,Wuxue 435400,Hubei Province,China)
出处
《科学与信息化》
2021年第26期21-23,共3页
Technology and Information
关键词
泵站
流量
排涝
pumping station
flow
waterlogging drainage