摘要
10 kV变配电室的安装施工直接影响着电力运行的稳定性和安全性,电力施工企业应不断提高变配电室的施工质量,确保用电安全。文章在对10 kV变配电室电气安装技术要点进行分析的基础上,指出要通过增强对准备环节的控制、严抓质量管理体制改革及确保调试工作质量过硬等措施不断提升10 kV变配电室电气施工质量,为电力施工企业提供相应的参考。
The installation and construction of 10 kV substation and distribution room directly affects the stability and safety of power operation.Power construction enterprises should continuously improve the construction quality of substation and distribution room to ensure the safety of electricity use.Based on the analysis of the main points of the electrical installation of the 10 kV substation and distribution room,the article points out that it is necessary to continuously improve the electrical installation of the 10 kV substation and distribution room through measures such as strengthening the control of the preparation link,strictly grasping the reform of the quality management system and ensuring the quality of the debugging work.The construction quality is expected to provides corresponding reference for electric power construction enterprises.
作者
恩克
王治平
En Ke;Wang Zhi-ping
出处
《电力系统装备》
2021年第14期36-37,共2页
Electric Power System Equipment
关键词
10
kV配电室
电气工程
安装技术
10 kV power distribution room
electrical engineering
installation technology