期刊文献+

基于PDCA循环模式的新工科实习基地建设与实践——以许昌学院电气与机械工程学院为例 被引量:3

Construction and Practice of New Engineering Practical Base with PDCA Cycle-Taking School of Electrical and Mechanical Engineering as an Example
下载PDF
导出
摘要 为了提高实习基地建设水平,进行了PDCA循环模式在新工科专业实习基地建设应用探究,给出了基于PDCA循环的质量监控体系构建,成立了涵盖计划层、执行层、检查层、处理层的组织架构和基地管理办法,推动PDCA循环模式良性运转,实现各方协调控制,基地建设水平明显提高. In order to improve the construction level of practice base,the application of PDCA cycle mode in the construction of new engineering specialty practice base was explored.Based on the construction of PDCA cycle quality monitoring system,the organizational structure and base management methods covering planning layer,execution layer,inspection layer and processing layer were established,which promoted the benign operation of PDCA cycle mode,realized the coordinated control of all parties and significantly improved the base construction level.
作者 王武 WANG Wu(School of Electrical and Mechanical Engineering,Xuchang University,Xuchang 461000,China)
出处 《许昌学院学报》 CAS 2021年第5期144-147,共4页 Journal of Xuchang University
基金 河南省本科高校大学生校外实践教育基地建设项目(许昌学院新工科专业实习基地) 许昌学院高水平应用型本科专业集群建设项目。
关键词 PDCA循环 新工科 实习基地 技术变革 PDCA cycle new engineering practical base technology change
  • 相关文献

参考文献7

二级参考文献47

共引文献87

同被引文献19

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部