摘要
为解决长平矿3#煤构造影响下的巷道围岩支护难题,本文在理论分析、数值模拟基础上,得出了陷落柱区域岩体应力四区分布,并给出塑性应力降低区的理论半径,在现场调研、工程应用基础上,采用超前预注浆及优化巷道锚网索支护,确定了长平矿3号煤巷道过陷落柱区域的支护技术,为矿井安全生产提供了技术保障。
In order to solve the problem of roadway surrounding rock support under the influence of the 3#coal structure in Changping Mine,this paper,based on theoretical analysis and numerical simulation,obtained the four-zone distribution of rock mass stress in the collapsed column area,and gave the plastic stress reduction zone The theoretical radius,on the basis of field investigation and engineering application,adopts advanced pre-grouting and optimized roadway bolt-net-cable support to determine the support technology of Changping Mine 3#coal roadway passing through the collapse column area,which provides safe production in the mine.Technical Support.
作者
金成成
JIN Chengcheng(Changping Coal Industry Co.,Ltd,Gaoping048400,China)
出处
《煤矿现代化》
2021年第5期23-25,共3页
Coal Mine Modernization
关键词
陷落柱
应力分布
支护
注浆
Collapse column
Stress distribution
The supporting
Grouting