高桩码头应变监测与结果分析 被引量:2

Strain monitoring and results analysis of high-piled wharf
下载PDF
导出
摘要 为了解高桩码头理论计算与实际情况之间的吻合状况,在主要构件上安装应变监测系统,测得码头构件在船舶靠泊、码头面堆载、岸桥作业3种工况下的应变值。分析监测结果,并与理论计算值进行对比。结果表明:(1)现场监测结果与理论建模计算的结果存在差异,但是二者的趋势是一致的;(2)加固改造方案有效;(3)对码头构件的实际受力状况有了直观了解。 In order to understand the coincidence between the theoretical calculation and the actual situation of the high-piled wharf,the strain monitoring system is installed on the main components to measure the strain values of the wharf components under three working conditions:ship berthing,stacking on wharf surface,and quay crane operation.The monitoring results are analyzed and compared with the theoretical calculation values.The results show that:(1)There are differences between the field monitoring results and the theoretical modeling results,but their trend is consistent.(2)The reinforcement scheme is effective.(3)We have a direct understanding of the actual stress condition of wharf components.
作者 李瑞刚 朱明友 LI Rui-gang;ZHU Ming-you(CCCC Water Transportation Consultants Co.,Ltd.,Beijing 100007,China;Shanghai International Port(Group)Co.,Ltd.,Shanghai 200136,China)
出处 《水运工程》 北大核心 2021年第10期236-240,共5页 Port & Waterway Engineering
关键词 高桩码头 应变监测 应变 理论计算 high-piled wharf strain monitoring strain theoretical calculation
  • 相关文献

同被引文献13

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部