摘要
结合上海徐家汇中心项目,对劲性节点深化设计管理方法进行了分析。从项目的疑难点出发,分析深化设计的组织架构、设计任务流程,阐述深化设计的质量管控、进度管控、例会制度和应急处理机制,并介绍项目所采用的信息化辅助设计方法,为以后类似项目进行深化设计提供了参考。
Combined with Shanghai Xujiahui center project,the management method of in-depth design of stiff joints is analyzed.Starting from the difficult points of the project,this paper analyzes the organizational structure and design task flow of the deepening design,expounds the quality control,progress control,regular meeting system and emergency treatment mechanism of the deepening design,and introduces the information aided design method adopted by the project,which provides a reference for the deepening design of similar projects in the future.
作者
陈伟
耿涛
CHEN Wei;GENG Tao(Shanghai Construction No.1(Group)Co.,Ltd.,Shanghai 200120,China)
出处
《建筑施工》
2021年第9期1750-1753,共4页
Building Construction
关键词
劲性节点深化
设计管理
质量管控
进度管控
例会制度
stiff joint deepening
design management
quality control
progress control
regular meeting system