结合工程实际,对体育馆椭圆曲面网架的卸载分析方法进行了介绍。在简要对比常用的卸载模拟分析方法优缺点的基础上,最终选择综合模拟卸载法进行分析。通过Midas Gen软件对网架结构施工卸载模拟分析计算,很好地模拟了实际卸载情况,同时操作方便,临时支撑退出受力条件明确,为后续施工的顺利开展提供了参考依据。
Combined with the engineering practice,the unloading analysis method of gymnasium elliptic curved grid is introduced.Based on a brief comparison of the advantages and disadvantages of the commonly used unloading simulation analysis methods,the comprehensive simulation unloading method is finally selected for analysis.Through Midas Gen software,the actual unloading situation is well simulated.At the same time,the operation is convenient,and the stress condition of temporary support is clear,which provides a reference for the subsequent construction.