期刊文献+

快速路匝道瓶颈特性与临界流率模型

Properties of bottleneck at ramp of expressway and related critical flow model
下载PDF
导出
摘要 对快速路汇入匝道瓶颈的特性进行实测数据研究。以密度和速度组合阈值法判断匝道瓶颈拥堵的发生,统计分析拥堵发生时的主线、匝道流量特征;基于跟驰理论和交通波理论分析了匝道合流区处由匝道车辆汇入对主线交通流造成的干扰,提出了主线交通流形成崩溃的条件;建立交通流崩溃临界主线-匝道流量模型,并用实测数据对模型参数进行标定,结果显示交通波速为24.6km/h,堵塞密度为113.8veh/km。研究表明,所提模型对于交通流崩溃临界条件的描述与实测数据具有很好的一致性。 This paper studies the characteristics of bottleneck at ramps of expressway based on empirical data.First,the density-speed combined thresholds are used for recognizing bottlenecks,and the flows of the main stream and the ramps are analyzed statistically.Then,the influence of ramp merging on the main stream is studied on the basis of car-following theory and ki-nematics wave theory.The condition resulting in breakdown phenomenon is proposed and the critical flow model regarding to the relation of flow in the main stream and the ramp is established.The model is calibrated with the field data.It is found that the speed of the traffic wave is 24.6 km/h and the jam density is 113.8 veh/km.The results show that the critical flow condition of the traffic breakdown described by the proposed model is well consistent with the empirical data.
作者 李宏海 盘意伟 王昊 LI Honghai;PAN Yiwei;WANG Hao(Research Institute of Highway Ministry of Transport,Beijing 100088,China;Foshan Urban Planning and Design Institute,Foshan 528010,China;School of Transportation,Southeast University,Nanjing 210096,China)
出处 《现代交通与冶金材料》 CAS 2021年第5期48-52,67,共6页 Modern Transportation and Metallurgical Materials
基金 智能交通技术交通运输行业重点实验室开放课题(F262019020)。
关键词 交通流 匝道瓶颈 交通崩溃 临界流率 traffic flow ramp bottleneck breakdown critical flow
  • 相关文献

参考文献2

二级参考文献21

  • 1Lorenz M R, Elefteriadou L. Defining freeway capacity as function of breakdown probability[J]. Transportation Research Record, 2001(1776) : 43.
  • 2Elefteriadou L, Roess R P, Mcshane W R. Probabilistic nature of breakdown at freeway merge junctions[J]. Transportation Research Record, 1995(1484) .. 80.
  • 3Zhang L, Levinson D. Some properties of flows at freeway bottlenecks [J ]. Transportation Research Record, 2004 (1883): 122.
  • 4Persaud B, Yagar S, Tsui D, et al. Breakdown-related capacity for freeway with ramp metering[J]. Transportation Research Record: Journal of the Transportation Research Board, 2001 (1748): 110.
  • 5Zhang L, Levinson D: Ramp metering and freeway bottleneck capacity [ J]. Transportation Research Part A: Policy and Practice, 2010, 44(4).. 218.
  • 6HCM. Highway capacity manual [M]. Washington D C:Transportation Research Board of the National Academies, 2010.
  • 7Persaud B, Yagar S, Brownlee R. Exploration of the breakdown phenomenon in freeway traffic[J]. Transportation Research Record, 1998(1634).. 64.
  • 8Brilon W, Geistefeldt J, Regler M. Reliability of freeway traffic flow: a stochastic concept of capacity[C]//Proceedings of the 16th International Symposium of Transportation and Traffic Theory. Amsterdam: Elsevier, 2005 : 125-144.
  • 9Ramakreshnan V, Banks J H. Relationship between mean flow rate and probability of breakdown at freeway bottlenecks [C/CD]// Transportation Research Board 85th Annual Meeting. Washington D C: Transportation Research Board, 2006.
  • 10Banks J H. Flow breakdown at freeway bottlenecks: evidence from automated flow analysis[J]. Transportation Research Record, 2009(2099).. 14.

共引文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部