摘要
介绍一种现场动车调试快速测试方法,以北京7号线现场测试里程碑为例说明目前存在的现场测试工期短的实际问题及优化改进方案后的项目实施情况。介绍现场测试序列的必要性,重点阐述测试的典型序列,并将该序列加载到测试系统中,最后以北京地铁7号线现场单车动车阶段的案例实施论证方法的可行性。
This paper introduces a fast method for the on-site train commissioning,taking the on-site test milestone of Beijing Line 7 as an example to illustrate the practical problems of short on-site test period and the implementation of the project after optimization and improvement.Firstly,this paper introduces the necessity of on-site test sequences,and then emphasizes the typical test sequences,and these sequences are loaded into the test system.Finally,the feasibility of the method is demonstrated by the case of Beijing Line 7 for the on-site single train commissioning.
作者
杨艳艳
任迎钱
Yang Yanyan;Ren Yingqian(Beijing Metro Consultancy Co.,Ltd.,Beijing 100068,China;Beijing Urban Construction Design&Development Group Co.,Ltd.,Beijing 100037,China)
出处
《铁路通信信号工程技术》
2021年第10期71-75,85,共6页
Railway Signalling & Communication Engineering
关键词
现场动车调试
测试序列
项目实施
on-site train commissioning
test sequences
project implementation