期刊文献+

化工企业余热发电循环水冷却塔技术改造 被引量:1

Technical Transformation of Circulating Water Cooling Tower for Waste Heat Power Generation in Chemical Industry
下载PDF
导出
摘要 铜陵有色铜冠冶化分公司硫酸生产余热发电循环水冷却塔年久运行,喷头堵塞,填料老化,配水管配水不均匀等,导致冷却塔出水温度高于设计值,影响余热发电冷凝器、冷油器等关键辅助设备的正常运行,间接影响余热发电的发电负荷。本文主要介绍通过对机械逆流式通风冷却塔的改造,以达到节能降耗的目标。改造的主要内容:重新设计配水管和喷头、收水器、填料。改造后,喷头布水均匀,循环水温达到设计温度,余热发电各辅助设备稳定运行,余热发电负荷提高。 The sulphuric acid production waste heat power generation circulating water cooling tower of Tongling Nonferrous Copper Crown Smelting and Chemical Branch has been operating for a long time,the nozzles are blocked,the filler is aging,and the water distribution pipe is uneven.The normal operation of key auxiliary equipment such as oilers indirectly affects the power generation load of waste heat power generation.This article mainly introduces the transformation of mechanical counterflow ventilation cooling tower to achieve the goal of energy saving and consumption reduction.The main content of the transformation:redesign the water distribution pipes and nozzles,water collectors,and fillers.After the transformation,the nozzles distribute water evenly,the circulating water temperature reaches the design temperature,the auxiliary equipment of waste heat power generation is operating stably,and the load of waste heat power generation is increased.
作者 姜林友 JIANG Lin-you(Tongling Nonferrous Metals Group Co.,Ltd.Anhui Tongling 244000)
出处 《世界有色金属》 2021年第14期138-139,共2页 World Nonferrous Metals
关键词 循环水冷却塔 喷头 填料 配水管 循环水温 Circulating water cooling tower Nozzle Filling Water distribution pipe Circulating water temperature
  • 相关文献

参考文献3

二级参考文献6

共引文献29

同被引文献30

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部