摘要 依托某填海场地基坑工程,分析预留基坑的难点,提出了基坑和海堤相结合的新型围护形式。通过工程分析、有限元计算,对预留基坑的结构形式、受力、变形特点及施工时序进行了分析。结果表明:复合式海堤、预留基坑方案合理、可行;节约了工期和造价,且能更有效地利用地下空间。 Based on the foundation pit project of a sea reclamation site,this paper analyzes the difficulties of reserving the foundation pit and puts forward a new type of retaining form combining foundation pit and sea wall.Through engineering analysis and finite element calculation,the structural form,stress,deformation characteristics and construction time sequence of the reserved foundation pit have been analyzed.The results show that the scheme of compound sea wall and reserved foundation pit is reasonable and feasible.The construction period and cost are saved,and the underground space can be used more effectively.
作者 马驰 MA Chi(China Academy of Railway Sciences(Shenzhen)Research and Design Institute Co.,Ltd.,Shenzhen 518034,Guangdong,China)
出处 《路基工程》 2021年第5期170-174,共5页 Subgrade Engineering
基金 中国铁道科学研究院集团有限公司基金(2018YJ168)。
关键词 复合式海堤 预留基坑 中心岛法 半逆作法 墙前反压体 抗滑移 composite seawall reserved foundation pit central island method semi-reverse construction method back pressure body in front of wall anti-sliding
  • 相关文献

参考文献6

二级参考文献21

共引文献99

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部