期刊文献+

福清核电M310机组蒸汽发生器传热管在役检查分析 被引量:1

Analysis of in Service Inspection of Steam Generator Heat Transfer Tube of M310 Unit in Fuqing Nuclear Power Plant
下载PDF
导出
摘要 核电厂运行期间,对蒸汽发生器传热管进行检查,找出结构可能产生的损伤,判断安全状态,确认是否应采取补救措施,是保证核电厂安全运行必须采取的措施。根据蒸汽发生器传热管的降质机理和福清核电在役检查依据的上游法规,分析了福清核电M310机组蒸汽发生器传热管在役检查的方式。 During the operation of the nuclear power plant,it is necessary to check the heat transfer tube of the steam generator,find out the possible damage of the structure,judge the safety state,and confirm whether remedial measures should be taken to ensure the safe operation of the nuclear power plant.According to the degradation mechanism of heat transfer tubes of steam generator and the upstream regulations of in-service inspection of Fuqing nuclear power plant,the inspection methods of in-service inspection of heat transfer tubes of steam generator of M310 unit of Fuqing nuclear power plante are analyzed.
作者 贺朝靖 HE Chaojing(Fujian Fuqing Nuclear Power Co.,Ltd.,Fuqing 350300,China)
出处 《电工技术》 2021年第15期178-179,181,共3页 Electric Engineering
关键词 核电厂 蒸汽发生器 在役检查 nuclear power plant steam generator in service inspection
  • 相关文献

参考文献3

二级参考文献20

  • 1朱跃钊,蒋金柱,桑芝富.影响胀接结构可靠性的几个因素[J].压力容器,2005,22(1):12-15. 被引量:18
  • 2胡建新.爆炸胀管工艺研究[J].江南集团技术,2002(6):16-19. 被引量:1
  • 3徐佳,李国继.液压胀管与机械胀管技术对比[J].锅炉制造,2006(3):65-66. 被引量:18
  • 4[1]MacDonald P E,Shah V N.Steam generator tube defect detection reliability and sizing accuracy[R].NUREG/CR-6365:204.
  • 5[2]John Douglas.Solutions for steam generators[J].EPRI Journal,1995,(5/6):28.
  • 6[3]Dobbeni D.NDT techniques for nuclear component[C].Brussels:Belgatom 2nd International Conference,1995.
  • 7毛希澜.换热器设计[M].上海:科学技术出版社,1998.526-533.
  • 8换热器.上海化学工业设计院[M].上海:科学技术出版社,1994.322-327.
  • 9姚慧珠 郑海泉.化工机械制造[M].北京:化学工业出版社,1998.178-180.
  • 10徐鸿.胀接接头弹塑性分析在换热器上的应用[J]{H}压力容器,1986(05):39-45.

共引文献19

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部