摘要 钻爆法开挖地下洞室是传统工法。在浙江缙云抽水蓄能电站的地下洞室钻爆法施工中,对传统工法进行优化,不仅提高了质量,而且还节约了施工成本。从钻爆设计、造孔控制、爆破施工3个方面进行阐述,其中放线布孔和尾线控制是钻孔质量的基础,钻工精准操作是钻孔质量的保障,不断地通过观察总结采取优化布孔和调整爆破参数的手段来提高工程质量。 Underground cavity excavation by drilling and blasting is a traditional construction method.In the construction of underground cavity of Jinyun Pumped Storage Power Station in Zhejiang Province,the traditional construction method is optimized,which not only improves the quality,but also saves the construction cost.This paper elaborates from three aspects:drilling and blasting design,hole-making control and blasting construction.The routing and tail line control are the basis of drilling quality,and the precise operation of drillers is the guarantee of drilling quality.Through observation and summary,the means of optimizing drilling arrangement and adjusting blasting parameters are constantly adopted to improve engineering quality.
作者 陆学华 蔡鹏 王栋林 LU Xue-hua;CAI Peng;WANG Dong-li(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
出处 《云南水力发电》 2021年第10期76-79,共4页 Yunnan Water Power
关键词 地下洞室 钻爆法施工 质量控制 节约成本 underground cavity drilling and blasting method quality control cost saving
  • 相关文献

参考文献4

二级参考文献37

共引文献680

同被引文献23

引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部