突发事件下大型客机“主—供”模式协同研制进度管理研究

WResearch on the Schedule Management of Collaborative Development of Main Manufacturer-Supplier Mode for Large Passenger Aircraft under Emergencies
下载PDF
导出
摘要 大型客机研制是一项复杂的系统工程,主要采用“主制造商—供应商”协同研制模式,主制造商和供应商共担研发成本和风险。当协同研制过程中发生突发事件时,进度计划的优化调整成为需要解决的首要问题。从进度计划管理的角度,对大型客机协同研制进程中的突发事件及其可能导致的风险进行识别,利用“S”曲线图分析法和横道图比较法对实际进度进行调整,以有效应对突发情况,降低风险,减少损失。 The development of large passenger aircraft is complex system engineering.The collaborative development mode of main manufacturer-supplier is mainly adopted,in which the manufacturer and the supplier share research and development costs and risks.When emergencies occur in the process of collaborative development,the optimization and adjustment of schedule becomes the first problem to be solved.From the perspective of schedule management,the emergencies and possible risks in the collaborative development process of large passenger aircraft are identified,and S curve analysis method and the transverse chart comparison method are used to optimize and adjust the actual progress in order to effectively respond to emergencies and reduce risks and losses.
作者 王翯华 张万龙 WANG He-hua;ZHANG Wan-long(Jinling Institute of Technology, Nanjing 211169, China)
出处 《金陵科技学院学报(社会科学版)》 2021年第3期48-54,共7页 Journal of Jinling Institute of Technology(Social Sciences Edition)
基金 国家自然科学基金项目“考虑‘能力—态度—环境’的大型客机协同研制供应链风险复杂网络演化与管控研究”(71502073) 金陵科技学院“科教融合”项目“复杂产品协同研制供应链进度规划风险影响因素研究”(2020KJRH09)。
关键词 大型客机 协同研制 突发事件 进度管理 large passenger aircraft collaborative development emergency schedule management
  • 相关文献

参考文献7

二级参考文献41

  • 1程海芳,张子刚.多供应商条件下集成供应商订货模型研究[J].工业工程与管理,2004,9(4):27-30. 被引量:19
  • 2吴育华,李崇斌,吴灵慧.割集平行路线差额法──一种确定网络计划最佳工期的有效算法[J].管理工程学报,1996,10(2):67-71. 被引量:2
  • 3马维野.一种检验判断矩阵次序一致性的实用方法[J].系统工程理论与实践,1996,16(11):103-105. 被引量:20
  • 4[2]D.L.Keefer,W.A.Verdini:Better Estimation of PERT Activity Time Parameters.Management Science,1993(39):1086~1091.
  • 5[4]Goldratt EM:Theory of Constraints.NY:North River Press,1990.
  • 6[5]Goldratt E.M:Critical Chain.NY:North River Press,1997.
  • 7[6]Newbold RC:Project Management in the Fast Lane:Applying the Theory of Constraints.Boca Raton,Florida:St,Lucie Press,1998.
  • 8[7]Chiu-Chi Wei,Ping-Hung Liu:Resource-constrained project management using enhanced theory of constraint[J].International Journal of Project Management.2002(20):561~567.
  • 9[8]Sood,Shailesh:Theory of constraints can change the way you manage your projects.Electronic Engineering Times,2002.
  • 10K. Bouleiman. H. Lecocq. A new efficient simulated annealing algorithm for the resource - constrained project scheduling problem and its multiple mode version[J]. European Journal of Operational Research. 2003 (149) :268 -281.

共引文献127

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部