期刊文献+

基于GIS的矿山地质测绘数据集成系统设计 被引量:2

Design of mine geological mapping data integration system based on GIS
下载PDF
导出
摘要 由于传统的矿山地质测绘数据集成系统构建的统计分析模型不稳定,导致数据集成时间较长,设计基于GIS的矿山地质测绘数据集成系统。基于GIS构建统计分析模型,实现测绘数据集成可视化,最终数据集成以图像的方式展示出来。实验结果表明,与传统的矿山地质测绘数据集成系统相比,当数据量为200kb时,本文系统进行数据集成的时间比传统系统快了5分钟,本文系统缩短了数据集成时间,完成了基于GIS的矿山地质测绘数据集成系统设计。 Due to the instability of the statistical analysis model of the traditional mine geological surveying and mapping data integration system,the data integration time is long,so the mine geological surveying and mapping data integration system based on GIS is designed.The statistical analysis model is built based on GIS to realize the visualization of Surveying and mapping data integration,and the final data integration is displayed in the form of image.The experimental results show that,compared with the traditional mine geological mapping data integration system,when the amount of data is 200KB,the data integration time of this system is 5 minutes faster than that of the traditional system,the data integration time of this system is shortened,and the design of mine geological mapping data integration system based on GIS is completed.
作者 徐英 XU Ying(Hunan Institute of geological surveying and mapping,Hengyang 421099,China)
出处 《世界有色金属》 2021年第13期20-21,共2页 World Nonferrous Metals
关键词 GIS 矿山地质测绘 数据集成 统计分析模型 GIS Mine geological mapping Data integration Statistical analysis model
  • 相关文献

参考文献3

二级参考文献15

共引文献4

同被引文献19

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部